Gemini network rollout to take 13 weeks, says Maersk CEO
NewsMaersk CEO Vincent Clerc has announced a 13-week timeline for the full rollout of the Gemini Cooperation network.
MMD Shipping, the stevedoring arm of Portsmouth International Port, UK, recently acquired a new Gottwald mobile harbour crane (MHC) from Konecranes for £2.1M. The crane is understood to be a two-rope Generation 5 Model 6 unit in the G HMK 6507 variant, with a maximum hook capacity of 125t, and a maximum outreach of 51m.
By registering you will have: