Consolidation in Kobe
NewsThree companies have signed a MoU to expand Kobe International Container Terminal.
The C2 Container Terminal at Japan’s Hakata port, which will have a 350m berth with a depth alongside of 15m, will be put into operation in the autumn, Fukuoka city’s Port & Harbor Bureau has announced.
The new terminal will be equipped with two ship-to-shore cranes supplied by Japan’s JFE Engineering Corp. With net load rating of 40.6t and an outreach of 50m, the earthquake-resistant cranes will be able to handle containers 18 rows across.
Read this item in full
This complete item is approximately 200 words in length, and appeared in the July 2008 issue of WorldCargo News, on page 4. To access this issue download the PDF here.
By subscribing you will have: