4 ZPMC STS cranes head for Baltic Hub as T3 project kicks into high gear
NewsFour ZPMC STS cranes are en route to Baltic Hub as construction of Project T3 ramps up.
The Chennai High Court in India has stayed an auction for a contract to develop a second container terminal at Tuticorin port in Tamil Nadu state after PSA International questioned its exclusion from the bidding.
PSA was among five entities qualified to bid for the terminal, which will have an annual capacity of 600,000 TEU. PSA made its bid in conjunction with local partner Sical Logistics, with which it already operates the existing container terminal at Tuticorin.
Read this item in full
This complete item is approximately 200 words in length, and appeared in the July 2009 issue of WorldCargo News, on page 7. To access this issue download the PDF here.
By subscribing you will have: