Rijeka Gateway’s 1st RTG stands tall
NewsThe first RTG crane at APM Terminals’ Rijeka Gateway has been fully assembled and stands tall in Maersk’s iconic blue.
APM Terminals (APMT) has signed a contract with Conductix-Wampfler for the electrification of RTGs at LCB Container Terminal 1 Ltd, Laem Chabang.
The new €1M (US$1.1B) contract is part of APMT’s ongoing programme, announced more than a year ago, to convert around 400 RTGs it has in operation worldwide to hybrid drive or electrical grid power.
Read this item in full
This complete item is approximately 2000 words in length, and appeared in the May 2012 issue of WorldCargo News, on page 61. To access this issue download the PDF here.
By subscribing you will have: