KOICA’s Union gap

News-in-print

El Salvador’s failure to find a concessionaire for the Port of La Unión (PLU) could leave it without a deepwater container handling facility and without the ability to develop a logistics network linking Central America’s Pacific and Atlantic coasts. This is the opinion of Alberto Arene, economist and former president of the country’s Autonomous Port Executive Commission (CEPA).

He stated that the lack of a concessionaire will indirectly help build a financial case for the construction of the proposed port of Amapala, in neighbouring Honduras, for which Korea International Cooperation Agency (KOICA) is undertaking a feasibility study. This would be a large, deepwater port on Tigre Island. Given the fact that Puerto Quetzal has also just opened in Guatemala, there may not now be a case to promote a rival facility in El Salvador.

According to Arene, the previous government of El Salvador understood that it needed a “heavyweight” operator for PLU. However, regional competition will drive down rates in Central America, and make it impossible for El Salvador to  compete. The original concession for PLU became viable only when the government suggested that U$15M would be made available to dredge the access channel, first to 10m and later to 12m, but the first stage should have happened in 2015. 

Had the PLU concession been a success, Honduras would not have proceeded with the Amapala project. The original idea was to create a logistics corridor linking PLU on the Pacific with Honduras’s Puerto Cortés on the Atlantic.  However, a change of government in El Salvador and new people in charge at CEPA appear to have scuppered this arrangement.

 

You just read one of our articles for free

To continue reading, subscribe to WorldCargo News

By subscribing you will have:

  • Access to all regular and exclusive content
  • Discount on selected events
  • Full access to the entire digital archive
  • 10x per year Digital Magazine

SUBSCRIBE or, if you are already a member Log In

 

Having problems logging in? Call +31(0)10 280 1000 or send an email to customerdesk@worldcargonews.com.
KOICA’s Union gap ‣ WorldCargo News

KOICA’s Union gap

News-in-print

El Salvador’s failure to find a concessionaire for the Port of La Unión (PLU) could leave it without a deepwater container handling facility and without the ability to develop a logistics network linking Central America’s Pacific and Atlantic coasts. This is the opinion of Alberto Arene, economist and former president of the country’s Autonomous Port Executive Commission (CEPA).

Do you want to read the full article?

Register to continue reading

By registering you will have:

  • Access to all Premium content
  • Discount on selected events
  • Full access to the entire digital archive
  • 10x per year Digital Magazine

SUBSCRIBE or, if you are already a member Log In

 

Having problems logging in? Call +31(0)10 280 1000 or send an email to customerdesk@worldcargonews.com.