Second Gottwald crane for Fospar

News-in-print

Terex Port Solutions (TPS) recently installed a second Terex Gottwald rail-mounted portal harbour crane for Fertilizantes Fosfatados do Paraná SA (Fospar) in Paranaguá, Brazil. The Model 4 crane in the G HSK 4316 B variant supports an identical crane delivered in 2012. They are used together to handle fertiliser on the finger pier of the terminal, where they have replaced two old cranes.

Do you want to read the full article?

Register to continue reading

By registering you will have:

  • Access to all Premium content
  • Discount on selected events
  • Full access to the entire digital archive
  • 10x per year Digital Magazine

SUBSCRIBE or, if you are already a member Log In

 

Having problems logging in? Call +31(0)10 280 1000 or send an email to customerdesk@worldcargonews.com.
Second Gottwald crane for Fospar ‣ WorldCargo News

Second Gottwald crane for Fospar

News-in-print

Terex Port Solutions (TPS) recently installed a second Terex Gottwald rail-mounted portal harbour crane for Fertilizantes Fosfatados do Paraná SA (Fospar) in Paranaguá, Brazil. The Model 4 crane in the G HSK 4316 B variant supports an identical crane delivered in 2012. They are used together to handle fertiliser on the finger pier of the terminal, where they have replaced two old cranes.

Do you want to read the full article?

Register to continue reading

By registering you will have:

  • Access to all Premium content
  • Discount on selected events
  • Full access to the entire digital archive
  • 10x per year Digital Magazine

SUBSCRIBE or, if you are already a member Log In

 

Having problems logging in? Call +31(0)10 280 1000 or send an email to customerdesk@worldcargonews.com.